Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Full Shutdown of L Train to Be Halted by Cuomo

Posted by Jackson Park B Train on Thu Jan 3 23:53:28 2019, in response to Re: Full Shutdown of L Train to Be Halted by Cuomo, posted by 3-9 on Thu Jan 3 23:14:01 2019.

In general, the insulation thickness for the same or greater voltage/amperage usage has decreased in thickness over the decades. That said, even while requiring "plenum grade" or similar low toxicity combustion producing materials, the vartious wires, cables do not need as much volume as what they are replacing. that said, they should not be a clearance issue IF carefully installed. When all of the wiring is replaced, and in the bargain much brighter LED tubes for future maintenance convenience, proably the old crumbling'bench' should be removed and replaced with new concrete to maintain the integrity of the tunnels.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]