"According to current GTFS schedule, 8444 trips will be scheduled tomorrow. Of these 789 or 9.3% of the trips will have one or more stops with a scheduled dwell time of 5 minutes or more each at one or more stops. Most of these are the stops just before the terminal. Terminal OTP is percent of trains that arrive more than 5 minutes late, according to the schedule. Pad an extra 5 minutes just before the terminal and – OTP improves.
Also, tomorrow, 1627 or 19.3% of the trips will have an accumulated scheduled dwell time of 5 or more minutes during the trip.
On looking at the GTFS-RT feed, the dwell times exist for the most part. Trains are more than 5 minutes late arriving at the 5 minute dwell time stops. The 5 minute dwell time translates into getting many of these trips on time by suddenly increasing their scheduled run time."

Where are the most egregious examples according to the current GTFS?

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]