Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal (1491721) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal |
|
Posted by Avid Reader on Sat Nov 3 11:51:47 2018, in response to Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal, posted by randyo on Fri Nov 2 18:31:59 2018. Was the total set length too long?A single "B" car could be pulled from the center 3-car set to shorten the overall length. Was it the over hang of the 67 ft. cars on the "S" turns thee Issue? At one time, back in the Day, standards plied those routes. What happened to change it. |