Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Jackson Park B Train on Fri Dec 15 14:03:56 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by AEM-7AC #901 on Fri Dec 15 02:43:47 2017.

which is precisely why so many of Amtrak's trains run DC (or south) through to Boston--most of the pax change out in NYC, but not all. Even with the slow shuffle of the crew change it is still faster than changing ends for two separate trains. The intense stupidity of having 4 different electrical systems on EMUs serving the several stations is something that must change. As to low platform bigots, the point of roll on roll off LEVEL platforms is rapid entry/exit.
The Illinois Central figured that out in the 1920s. The facts have not changed.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]