Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Holiday Train 1300 The Real Story

Posted by randyo on Thu Dec 8 20:47:48 2016, in response to Re: Holiday Train 1300 The Real Story, posted by Joe V on Thu Dec 8 14:56:22 2016.

edf40wrjww2msgDetail:detailStr
If the C/R operating position is set up with the D type on one side of the C/R and the R-9s on the other, the doors don’t have to actually MU. The door controls on the D will be fully functional as long as the door handles are unlocked and the door controls on the R-9s will also be fully functional as long as the drum switch on the R-9 is set to the “on”position and the M/M’s indication will pass through without any problem.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]