Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Transmogrifornication of N's and Q's at Ditmars Blvd Terminal

Posted by randyo on Mon Aug 29 13:31:54 2016, in response to Re: Transmogrifornication of N's and Q's at Ditmars Blvd Terminal, posted by Chris R16/R2730 on Mon Aug 29 06:36:12 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
However, when the code was working properly, City Hall master tower controlled the switches although when I was breaking in at 57 as a Tw/M, the T/D insisted that 57 take control from C/Hall so that I could learn how to actually operate 57 tower in the event of a code failure. By the way, the N/B move was from A4 to A2. A1 and A3 are the southbound tracks.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]