Re: Both directions closed at the same time, for 18 months

Posted by Broadway Lion on Wed Jul 27 10:31:11 2016, in response to Re: Both directions closed at the same time, for 18 months, posted by AlM on Tue Jul 26 19:14:07 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I tall depends (on who has the bathroom key).

If they will rebuild the stations, then no. If the stations they are not rebuilding, then two trains can be run, one on each track with no interlocking. Just put a motoman on each end. There is room for a third set of equipment on a layup track, so that ehy can be switched out for cleaning, maintenance and whatever. They would still need to be able to move through the tunnel for swapping out equipment and for major and scheduled maintenance.

If the use of the tunnels is not available for that occasional equipment exchange, then no, there could be no service in Manhattan. But it seems to LION that even though service will have to be zero at some time during the construction is should be possible to run said described shuttle service.

If there is no live rail in the tunnel, but the tracks are intact, a diesel locomotive could swap out the equipment once in a wild.

ROAR

(There are no responses to this message.)