Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: (M) Line during (L) tunnel closure

Posted by Wallyhorse on Sat Feb 13 02:24:55 2016, in response to Re: J line extension to Bay Ridge after Second Avenue subway opens?, posted by AlM on Fri Feb 12 14:53:25 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There are too many fumigation issues, which is why I would send any additional (M) trains signed as (T) to 96th/2nd 24/7 (replacing the late night and weekend (M) shuttles) since CBTC work likely is going to complicate having the (M) go to 71st-Continental on weekends. If necessary, I would run 1-2 extra (M) TPH that would terminate at QP so the (E) isn't too much affected.

Better on the QB end would be to have the (G) (M) and (R) all run to 179th Street ((G) with (F) late nights and if CBTC work is being done the (G) on weekends truncated to Court Square where it is now) with the (F) at all times express on the full route. It can be done with if there is a jam-up trains on the local track can be moved to the express after Parsons Boulevard (skipping 169th Street). This would take some pressure off the (E) and (M) in particular and also in particular off of Court Square by doing this.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]