Re: Scheduling Capacity (1353436) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Scheduling Capacity |
|
Posted by Stephen Bauman on Sat May 23 21:52:07 2015, in response to Re: Scheduling Capacity, posted by BusRider on Sat May 23 21:37:30 2015. The Eastern Division, consisting of the J/Z, L, and M lines correct?That's correct. The principal problems will be with the L and J/Z because of eastern terminal elimination. They also eliminated the Canal St terminal on the western end. However, the Chrystie St. connection makes up for that loss. |