Re: Denver EMUs Running Under Power (1349727) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Denver EMUs Running Under Power |
|
Posted by Steve B-8AVEXP on Sun Apr 26 15:58:16 2015, in response to Re: Denver EMUs Running Under Power, posted by Steve B-8AVEXP on Fri Apr 24 20:54:24 2015. One other observation: although there is a 4.5-mile single-track stretch along Pena Blvd., there is a provision for a second track. For instance, the bridge over E-470 has room for a second track, as does another bridge over a gulch just before E-470. Plus the entire stretch was graded to permit a second track to be built when needed. However, the long, sweeping bridge over Airport Blvd. and I-70 is a single-track bridge.The bridge over Pena Blvd. as the line approaches the airport is double tracked. |
(There are no responses to this message.)