Posted by Joe V on Sun Mar 29 11:46:27 2015, in response to Re: NJT Arrow III on non-electrified track in Hoboken Terminal, posted by tramrunner on Sun Mar 29 10:45:13 2015. Lower level for electrical equipment.They need something to shove those behemoth MLV's along the track better. It was actually Amtrak's insistence. They understand a conversion from Arrow to loco-hauled MLV means a a further performance degradation. As the same time, NJT is philosophically opposed to buy anything that is single level. |