Re: The Time for Reactivation of the Rockaway Beach Line is Now (1326138) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: The Time for Reactivation of the Rockaway Beach Line is Now |
|
Posted by Edwards! on Sun Nov 30 16:48:02 2014, in response to Re: The Time for Reactivation of the Rockaway Beach Line is Now, posted by Elkeeper on Sat Nov 29 19:59:50 2014. All four tracks have thirty trains per hour potential.. with Hillside being able to turn them all...The problem here is Continental ave being used as a terminal,instead of a through station. |