Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: The Time for Reactivation of the Rockaway Beach Line is Now

Posted by randyo on Wed Nov 26 12:49:52 2014, in response to Re: The Time for Reactivation of the Rockaway Beach Line is Now, posted by gp38/r42 chris on Wed Nov 26 07:19:18 2014.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Good point but unfortunately, the way the infrastructure was built pretty much dictates the number of available options. Even the proposed connection the the Rockaways from N/O Roosevelt Av was shortsightedly designed with access only from the local tracks. Considering that the IND was supposed to have been built in such a way as to eliminate the problems that the BMT and IRT had regarding junctions, it seemed to have dropped the ball at locations like Canal St, Jay St, 50/6 and Qns Plaza.Those locations should have been designed as flying junctions like 42/8, 59 St and 135 St so that both lcl and exp trains could access all available branches.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]