(F) Train In Near-Miss With Huge Drill Bit In Queens Tunnel (1321695) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
(F) Train In Near-Miss With Huge Drill Bit In Queens Tunnel |
|
Posted by JayZeeBMT on Thu Oct 30 19:11:21 2014 A packed midday (F) train was almost cut open by a huge drill bit being used on the East Side Access project, MTA officials said today. The tool, which was drilling from above ground, grazed the top and side of a passing (F) train near the 21 St-Queensbridge station. Although no one was injured, this was a VERY close shave...no pun intended. |