Re: LIRR station rehab: Hunterspoint Avenue Station, + ADA elevator |
|
Posted by Joe V on Thu Aug 21 18:42:01 2014, in response to LIRR station rehab: Hunterspoint Avenue Station, + ADA elevator, posted by Gold_12th on Wed Aug 20 21:50:19 2014. Well, well, well, HPA means either or both of 2 things:1) The station remains for some diesel trains after ESA 2) They expect the 2023 date to slip some more. In the mid-1980's there were plans to build another platform on the north side, and run a pedestrian walkway over Line 1, but not as high as the street, and punch a hole into the side of the subway station mezzanine. |