Re: Queens Back In The Day (1287246) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Queens Back In The Day |
|
Posted by Chris R16/R2730 on Thu Apr 24 10:06:42 2014, in response to Re: Queens Back In The Day, posted by Elkeeper on Tue Apr 22 20:36:32 2014. The Archer Ave connection was trickier, because the el rises over the LIRR mainline. To avoid an unecessary hump, about a blocks worth of el had to be replaced with one which was level with the ramp.![]() However, this connection was complete 15 months before the line opened. The ramp was used for layups the entire time. |
![]() |
(There are no responses to this message.)
![]() |
![]() |