Re: CTA: 16 buildings need to be razed for Belmont 'L' overpass (1286391) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: CTA: 16 buildings need to be razed for Belmont 'L' overpass |
|
Posted by Michael549 on Fri Apr 18 13:02:29 2014, in response to Re: CTA: 16 buildings need to be razed for Belmont 'L' overpass, posted by andy on Fri Apr 18 12:08:15 2014. There are two other flat junctions:1) On the #2 and #3 lines on Lenox Avenue about 142nd Street where the two tracks of the #2 from the Bronx, meet the two tracks of the #3 from 145th Street. There Manhattan-bound #2 trains block the path of 148th Street-bound #3 trains, and vice-versa. 2) on the #1 line just south of the Rector Street station, where the two tracks that head to the newer 2-track South Ferry terminal of the #1 (yes, the one that was flooded by Hurricane SAndy), meets the two tracks that lead to the old South Ferry loop station of the #1. While generally speaking both the loop terminal and two-track stub terminal were not in operation at the same time, such a scenario is not impossible. Mike |