| Re: tracks after 57th St/6 Av (1224366) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: tracks after 57th St/6 Av |
|
|
Posted by 3-9 on Fri May 24 03:27:47 2013, in response to Re: tracks after 57th St/6 Av, posted by Edwards! on Fri May 24 00:17:57 2013. A new tunnel to Brooklyn could solve a couple of IND bottlenecks that's currently plaguing the system.As for the Manhattan Bridge access, there 3 proposals for Chrystie St., one of which is to go with the '60's plan of the SAS being at the same level as the 6th Ave lines (shallow Chrystie?). For now though, they are only proposals, nothing has been set. If they go with shallow Chrystie, that would solve the problem with bridge access. |