Re: Major problems at Dekalb Av - (B) (D) (N) (Q) (R) trains |
|
Posted by randyo on Wed Aug 15 18:42:15 2012, in response to Re: Major problems at Dekalb Av - (B) (D) (N) (Q) (R) trains, posted by MainR3664 on Wed Aug 15 15:04:37 2012. If the Brighton to Culver connection had been built, it would have utilized the Fkln Shtl tracks N/O PPk to connect to a new tunnel to be built under Prospect Pk which would have connected to the Culver express tracks. That was at a time when serious consideration was being given to abandoning the Fkln Shtl entirely. |
![]() |
![]() |
![]() |