Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: A line Action

Posted by randyo on Mon Aug 13 15:52:48 2012, in response to Re: A line Action, posted by Elkeeper on Mon Aug 13 15:48:31 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The decision not to run service over the GWB was made long after the initial 2 track infrastructure was in place and the additional service was not needed at the time and probably still isn't. Don't forget when the IND was built the GWB only had one level and I have heard that the bridge was actually designed to have tracks on the upper level. The concept of subway service on the bridge was briefly resurrected when it was thought that it would run on the lower level.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]