Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Unbuilt Stuff

Posted by tunnelrat on Sun Aug 5 09:01:21 2012, in response to Re: Unbuilt Stuff, posted by randyo on Sun Aug 5 04:01:14 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The sealed up 2 track tunnel under owls head park was NOT for the proposed bmt/sirt conn.under the bay.it was for a combo freight & passanger line from jersey connecting from a seperate[but equal] RR[B&O] line NOT connected to sirt.it was designed to conn.into the lirr at 5th.ave,bklyn.A 1930`s plan would have connected it into sirt.the bellmouths at 59st& 4th ave.would have been the original sirt,brt. conn.the brick walls at 59st are false walls.the tunnel extends for apx.30 more feet.on the concrete wall are giant feeder cables.I,ve seen this.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]