Re: Elevated (1168973) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Elevated |
|
Posted by The Silence on Fri Jul 27 17:56:38 2012, in response to Re: Elevated, posted by Elkeeper on Fri Jul 27 17:28:11 2012. the process to electrify obviously had to have been started long before the talks, I think it's safe to say before the IRT started construction.If the MER had switched to the IRT system, they would have had to go out and re-aline every inch of third rail, and ordern subway contact shoes. Also, consider that until the H system went into effect, Manhattan El track miles outnumbered IRT subway track miles about 2 to 1. it probibly would have been cheaper and easier for the still under construction IRT to have implemented El third rail instead. |