Re: Best Article I've Read on Reasons to Reactivate the Rockaway Beach Line

Posted by randyo on Wed May 2 17:22:58 2012, in response to Re: Best Article I've Read on Reasons to Reactivate the Rockaway Beach Line, posted by JayZeeBMT on Wed May 2 16:02:16 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I wouldn't be too sure about that. The SAS was planned long before the Flushing Line extension to Javits was even though of and it looks like like the Flushing line extension will be actually operating before the rails are even laid in the SAS. The former LIRR ROW is completely above ground and needs no excavation work but mostly land clearance. Also, depending on the accuracy of available info, the tunnel connections from 63 Dr on the Qns Blvd line are reported to be almost completely intact form the subway infrastructure all the way to the LIRR ROW so construction in that area may well be minimal so it could be possible for upgrading of the Rocky Bch branch t keep pace with the construction of the SAS depending on which political forces have the most clout.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]