Re: Rush hour J to 9 Av (1150887) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Rush hour J to 9 Av |
|
Posted by GP38/R42 Chris on Sat Apr 14 20:48:22 2012, in response to Re: Rush hour J to 9 Av, posted by Wado MP73 on Thu Apr 12 11:15:34 2012. I have mixed feelings about it. While I agree, another line would be nice, at the same time, we have the very underutilized Nassau line, far from near capacity, with an already connection to an underutilized tunnel to Brooklyn all there already. In an ideal world, with unlimited funds, the new line would be great, but in a realistic world, with very limited funds, to just have this underutilized infrastructure just sitting there and not use it seems silly. |
(There are no responses to this message.)