Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: DMU's for LIRR are funded

Posted by WillD on Sun Apr 1 16:41:00 2012, in response to Re: DMU's for LIRR are funded, posted by Joe V on Sun Apr 1 11:40:35 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They're going to extend the electrification to some point on the Greenport Line at some point in the future. The diesel territory will continue to shrink until the operation of the tiny DMU fleet cannot be economically justified. At that point they'll have to make a decision as to whether they'd rather just electrify the line or cut the service.

That's why it is crucial to the survival of the eastern end lines that any extension of the electrification be undertaken with high voltage AC OHLE. A third rail electrification could never be justified to the eastern end of LI, but with the lower marginal cost of an AC electrification the possibility would at least exist.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]