Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Schumer Backs Second LIRR Track in Farmingdale

Posted by Avid Reader on Mon Mar 19 20:40:09 2012, in response to Re: Schumer Backs Second LIRR Track in Farmingdale, posted by Olog-hai on Mon Mar 19 20:04:27 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I agree with you, there is a need in lower Manhattan.

The already built lower level tunnel under the east river was in place.
The streets to bore under near Grand Central terminal have less and will require less building under pinning. Far Less costly.

Upper levels of the terminal already in place, at GCT.

What kind of low profile coaches does NJT have, if trains were to continue to Brooklyn from NJ.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]