Re: Details about : '' STABILIZE FRANKLIN AVENUE SHUTTLE TRACKWAY'' project (1138313) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Details about : '' STABILIZE FRANKLIN AVENUE SHUTTLE TRACKWAY'' project |
|
Posted by PATHman on Thu Feb 9 23:38:03 2012, in response to Re: Details about : '' STABILIZE FRANKLIN AVENUE SHUTTLE TRACKWAY'' project, posted by B49 Limited on Fri Nov 11 22:28:14 2011. All the G needs is a transfer to an IRT line. Imagine if someone was able to travel from Greenpoint to the Brooklyn Museum without backtracking. Hoyt-Schermerhorn could be connected to Hoyt Street on the 2 and 3. |