Re: Details about : '' STABILIZE FRANKLIN AVENUE SHUTTLE TRACKWAY'' project |
|
Posted by SelkirkTMO on Fri Nov 11 18:31:09 2011, in response to Re: Details about : '' STABILIZE FRANKLIN AVENUE SHUTTLE TRACKWAY'' project, posted by tunnelrat on Fri Nov 11 18:19:20 2011. Contractors can only bid and perform on the detailed specifications submitted to them. I know NOTHING about what happened, but if those were the specs, then they *had* to build as specified. If those WEREN'T the specs, then somebody was asleep at the switch on "acceptance." |