Re: Dulles Corridor Metrorail Project Pictures 10 15 2011

Posted by Sand Box John on Sat Oct 22 22:25:11 2011, in response to Re: Dulles Corridor Metrorail Project Pictures 10 15 2011, posted by Fine, Howard, and Fine on Sat Oct 22 21:24:07 2011.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There is a sidewalk to be seen on (I think) one side of Rt 7 in two of the pictures.

The pictures that show them are on the north side, There are sidewalk on both sides of VA-7 Leesburg Pike now. Prior to the lane relocating to accommodate the metrorail easement in the median there were none.

Here are couple showing the sidewalk on the south side:


Post-tension segments staged along Leesburg Pike between Gosnell Road / Westpark Drive and Spring Hill Road


West end of Tyson West (Spring Hill Road) station

Added bonus, sidewalk along the south side of VA-123 Dolley Madison Boulevard:


VA-267 Dulles Connector Road / Anderson Road and VA-123 Dolley Madison Boulevard

Prior to the beginning of construction I believe there was a sidewalk on the north side VA-123 Dolley Madison Boulevard between Anderson Road and Capitol One Drive.

John in the sand box of Maryland's eastern shore.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]