Re: Segmented or closed IND mezzanines (1073925) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Segmented or closed IND mezzanines |
|
Posted by randyo on Sat Jun 11 13:59:45 2011, in response to Re: Segmented or closed IND mezzanines, posted by tunnelrat on Sat Jun 11 10:36:35 2011. While the upper level platform at Roosevelt was supposed to stub end, there is an area N/O Roosevelt where 3 of the 4 tracks of the proposed Rockaway extension actually meet. The N/B lc tk for which you can see a bellmouth off the lower level tk and the S/B lcl tk which actually descends to the lower level were supposed to connect to the mainline N/O the station. |