Re: 76th St area - Satellite (Re: Q About LTV Squad and 76th Street) (1030064) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 76th St area - Satellite (Re: Q About LTV Squad and 76th Street) |
|
Posted by Randyo on Wed Jan 26 15:22:05 2011, in response to Re: 76th St area - Satellite (Re: Q About LTV Squad and 76th Street), posted by tunnelrat on Wed Jan 26 15:17:31 2011. Highly doubtful since the portion of the Fulton St El between Hinsdale and Grant had not been rebuilt to dual contract standards and could not support anything heavier than a Multi and I don't think the city at that point would have wanted to rebuild any el structures. I would imagine if that portion had been rebuilt under the dual contracts, then the IND would have connected it up at that point to save on construction costs. |