Home · Maps · About

Home > BusChat

[ Post a New Response | Return to the Index ]

(339930)

view threaded

Brooklyn Bus Redesign Study.

Posted by Chicago44 on Thu Jul 2 09:47:59 2020

I wonder what changes are going to be proposed when the Brooklyn Bus Redesign Study Draft Report is completed?

Post a New Response

(339931)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by Dan on Thu Jul 2 09:56:16 2020, in response to Brooklyn Bus Redesign Study., posted by Chicago44 on Thu Jul 2 09:47:59 2020.

I would expect to see any action on the remaining bus re-designs until 2022. Brooklyn, then Manhattan, then the S.I. local routes.

Post a New Response

(339943)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by The silence on Thu Jul 2 20:41:49 2020, in response to Brooklyn Bus Redesign Study., posted by Chicago44 on Thu Jul 2 09:47:59 2020.

I don’t know if you noticed, but everything related to the redesign project has hit the brakes

Post a New Response

(339944)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by randyo on Thu Jul 2 21:29:27 2020, in response to Re: Brooklyn Bus Redesign Study., posted by The silence on Thu Jul 2 20:41:49 2020.

MTA is probably going to look for more service to cut.

Post a New Response

(339964)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by BrooklynBus on Sun Jul 5 06:43:30 2020, in response to Re: Brooklyn Bus Redesign Study., posted by randyo on Thu Jul 2 21:29:27 2020.

I think the studies are dead except for eliminating bus stops and shortening and cutting routes and reducing service spans.

Post a New Response

(339965)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by BrooklynBus on Sun Jul 5 06:46:46 2020, in response to Re: Brooklyn Bus Redesign Study., posted by BrooklynBus on Sun Jul 5 06:43:30 2020.

The Existing Conditions report hinted at cutting Downtown Brooklyn bus service because of all the subway lines there. They also stated that Downtown Brooklyn is the fastest growing part of the borough. So you see where their head is at. The purpose was always to cut service not to improve service.

Post a New Response

(339966)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by Joe V on Sun Jul 5 10:47:41 2020, in response to Re: Brooklyn Bus Redesign Study., posted by BrooklynBus on Sun Jul 5 06:43:30 2020.

They will still carry out their grudges, like along the Rockaway peninsula, and blame the pandemic for it.

Post a New Response

(339971)

view threaded

Re: Brooklyn Bus Redesign Study.

Posted by BrooklynBus on Mon Jul 6 06:33:45 2020, in response to Re: Brooklyn Bus Redesign Study., posted by Joe V on Sun Jul 5 10:47:41 2020.

As I said, the cuts and bus stop eliminations will go through.

Post a New Response


[ Return to the Message Index ]