edf40wrjww2msgDetailB:detailStr fiogf49gjkf0d Shop Overhaul: The Shop program is complex with significant issues including the following:
Savings generated by not overhauling MCI '05 &'06 due to planned retirement in 2017. As a
result of extending and eliminating MCI overhauls, 2011 CNGs have been accelerated to a 4
year overhaul cycle. MTA Bus is in the process of doing a tear down of the MCI engines ('06,'07
&'09) to finalize the scope of work. As a result, the number of MCI engines in 2015 has been
reduced until the final workscope is determined, and the balance was reallocated to 2016 and
2017.
|