Re: Brooklyn Bus Network Redesign needs another look (350396) | |||
![]() |
|||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Brooklyn Bus Network Redesign needs another look |
|
Posted by Spider-Pig on Fri Aug 15 16:39:25 2025, in response to Re: Brooklyn Bus Network Redesign needs another look, posted by BrooklynBus on Thu Aug 14 15:39:20 2025. Well, that’s a different story, but I was assuming the B2 and/or B100 would still end at KH.But going back to the east Fillmore section, giving them the B9 replaces their trip to an express station with a longer trip to a local station. Anyway, why would you extend the B2 anyway? If locals aren’t going to KP, why do they need a direct bus to Bay Ridge? |
![]() |
![]() |
![]() |