| Re: Queens Bus Network Redesign: Existing Conditions Report (335806) | |||
|
|
|||
| Home > BusChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: Queens Bus Network Redesign: Existing Conditions Report |
|
|
Posted by N6 Limited on Sun Sep 8 20:10:49 2019, in response to Re: Queens Bus Network Redesign: Existing Conditions Report, posted by Joe V on Sun Sep 8 18:15:29 2019. Traffic tends to move slow under El's, is that the section you're talking about? |