Re: Will Queens Bus Redesign really speed things up? |
|
Posted by AlM on Mon May 6 09:03:43 2019, in response to Re: Will Queens Bus Redesign really speed things up?, posted by BrooklynBus on Mon May 6 07:54:52 2019. On 86 Street where there are no exclusive bus lanes only about 90 seconds was saved for the entire trip?I'm not familiar with 86th Street. But if you told me that would be the time savings for the M14A/D I would know you were smoking something. I have frequently observed the eastbound M14 spend more than 3 minutes loading passengers just at the Irving Place stop. In fairness, the M14 is scheduled for SBS in June. I probably picked one of the worst examples in the system. |