Home · Maps · About

Home > BusChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Q48 Re: Q48 Guide-a-Ride question

Posted by New Flyer #857 on Fri Feb 27 11:34:54 2015, in response to Re: Q48 Re: Q48 Guide-a-Ride question, posted by checkmatechamp13 on Fri Feb 27 00:17:49 2015.

edf40wrjww2msgDetailB:detailStr
fiogf49gjkf0d
Something like that, yes.

But the S44 and S79 have other fish to fry than Richmond Ave. I'm suggesting, on my imaginary line, that two routes begin at each outer terminal. One would be the route that goes the whole length of the line, the other would end at a suitable point past the midpoint. None of the shorter lines would be extended.

The reason why the S44 and S59 get scheduled as such is because the S44 has other obligations and other schedules to fit (e.g. the ferry). But if you have a line where three routes are all committed exclusively to the same corridor, without going past the outer terminals in either direction, then you can have a little system and set the schedule exactly as desired.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]